LIFECYCLE / 04

Commissioning

04 · FAT, INSTALLATION & SAT

Commission with a live evidence model, not a document scramble.

ALVA assembles verification evidence from design and manufacturing, tracks punch items and preserves the connection between contractual acceptance criteria and what is observed on the machine.

78%GATE READY
READINESS

Evidence status before FAT

FAT records24/27ready
Open NCR1mechanical
I/O checks96%mapped
Customer approvals2/3one pending
VERIFICATION THREAD

Acceptance criteria stay linked to origin

TestOriginStatusEvidence
FAT-12 FlowREQ-047ReadyProtocol v4
FAT-18 CIPREQ-083ReadyMaterial + sequence
FAT-21 AlarmREQ-122ReviewPLC rev pending
SAT-07 CapacityContract §7.3PlannedSite data needed
COMMISSIONING CO-PILOT

ALVA prepares the next action from the evidence gap.

Rather than simply reporting 78% readiness, it identifies the exact blockers, owners and source documents required to reach the gate.

Next: obtain FAT protocol approval → close NCR-17 → complete final PLC alarm test → issue controlled FAT pack.
HANDOVER

Installed asset inherits its engineering history

As-designedmodels · calculations · requirements
As-builtserials · certificates · deviations
As-operatedsignals · service · performance